Sustainability
The RIAS and RIBA are committed to meeting the challenges of Climate Emergency and resource depletion and raising the understanding of sustainability within the profession. All projects are expected to meet statutory targets in terms of sustainable outcomes, and to measure and verify building performance. This aligns with the objectives of the RIBA 2030 Climate Challenge, as together we seek to demonstrate the crucial role architecture must play in mitigating and adapting to the climate crisis.
Sustainability data
A detailed overview of the sustainability information required for the 2027 RIAS Awards.
-
Gross internal conditioned floor area (m²)
The gross internal floor area that is conditioned (eg. heated and/or cooled)
% Occupancy during 12-month period
The percentage occupancy, for this form, must relate to the energy data collection period.
Is the project new-build or refurbishment?
Describe the extent of the work.(max. 300 words)
Did the project make use of existing fabric or structure? Did the project team evaluate whether existing elements could be retained and upgraded instead of demolition and new build? Was a building demolished on site? Give details of its condition, include listed status if applicable.
Airtightness (m³/hr m² at 50Pa)
Provide any other supporting information relating to the building specification. (max. 200 words)
Please include any sustainability certifications achieved.
Outline sustainability drivers, concepts, and specific environmental performance outcomes of the building.(max. 300 words)
How was sustainability considered during the architectural concept, form development, construction, and building end-use stages? Describe any performance analysis undertaken and the measured sustainability outcomes. Were there any special project objectives, challenges, or constraints? Was the design reviewed against the impacts of future climate change (e.g. future weather, flood risk, overheating risk)? Are there any innovations in sustainable construction? What are the key indoor and outdoor water use strategies? Did the brief inform the sustainability strategy? What is the net-to-gross efficiency?
-
Predicted energy use (kWh/m²/y)
This is the total annual predicted regulated and unregulated energy use (measured in kilowatt-hours per metre squared per year based on the gross internal area (GIA) of the building).
Actual energy use (kWh/m²/y)
This is the total annual gross operational energy (electricity and gas) use (measured in kilowatt-hours per metre squared per year based on the gross internal area (GIA) of the building) taken from measured data.
Figures should reflect gross energy use and therefore should include energy used on-site from any on-site renewables. The measurement should be taken from energy meter readings (or energy bills + PV meter) for the building over a year.
If this metric is not applicable to your project, enter '0' (zero) into the data field and provide an explanation in the 'supporting information' textbox.
-
Is gas used on site?
Gas usage (kWh/m²/yr)
The actual annual gas usage (if applicable).
-
On-site renewable energy generation (kWh/yr)
The total annual renewable energy generated on-site, excluding heat pumps (if applicable).
Is the site connected to a district heat system?
Provide details of the district heat system (max. 200 words) (if applicable)
What is the primary heating technology (for example gas boiler, gas combined heating and power, air/water/ground source heat pump)? If combined, please give an approximate split. At what temperature is the network delivering the heat? Is the heat upgraded in the building?
-
Potable water use (litres per person per day)
The total annual drinking water used on site, measured in litres per person per day (l/person/day) in domestic and non- domestic, and metres cubed per pupil per year (m3/pupil/yr) for schools, taken from measured data. If this metric is not applicable to your project, enter '0' (zero) into the data field and provide an explanation in the 'supporting information' textbox below.
-
Building design life (years)
The assumed building design life used in the assessment (typically 60 years).
Upfront carbon (KgCO₂eq/m²)
The greenhouse gas emissions associated with materials and construction processes up to practical completion (Modules A1-A5 of RICS Whole Life Carbon Assessment for the Built Environment). Upfront carbon excludes biogenic carbon sequestered within installed products at practical completion.
Life cycle embodied carbon (KgCO₂eq/m²)
The whole-life embodied carbon emissions associated with materials and construction processes (Modules A1-A5, B1-B5, C1-C4 of RICS Whole Life Carbon Assessment for the Built Environment).
Whole-life carbon assessment (KgCO₂eq/m²)
The total whole-life carbon emissions, including both operational and embodied carbon across the asset life cycle (Modules A1-A5, B1-B7, C1-C4 of RICS Whole Life Carbon Assessment for the Built Environment).
Carbon assessment methodology (max. 300 words)
Explain the basis of the carbon calculations provided.Confirm which RIBA Stage calculations were undertaken at, and state assumed building life and assessment boundary (cradle to gate/cradle to practical completion/cradle to grave). Confirm which life-cycle stages were included. If you have been unable to provide whole-building carbon figures, but have calculations for specific building elements, you can use this textbox to provide the data and specify how they have been reached.
Describe any strategies used in the building’s design to reduce embodied carbon. (max. 300 words)
The strategies used to reduce embodied carbon through the building's design, specification, procurement, and construction.
To what extent has the project considered the circular economy? (max. 300 words)
Explain how the design supports material efficiency, longevity, adaptability, disassembly, or future reuse. Give examples of recycled, reclaimed, reused, or low-impact materials used.
-
Explain the ecological strategy (max. 300 words)
How does the project enhance biodiversity, increase green infrastructure or create opportunities for productive growing spaces (for example local food production)? Were considerations made for biophilic design? What measures have been taken to mitigate any loss of Category A and B trees? Is the project situated on designated landscapes (e.g. greenfield land, Areas of Outstanding Natural Beauty, locally designated landscapes)? If so, what measures have been taken to mitigate the impact on the environment? How are any biodiversity net gain benefits safeguarded for future years on the site?
Biodiversity net gain (BNG) % -
Provide any other information that supports or explains the sustainability data submitted (max 200 words)
Upload a PDF containing any supporting information that will help the jury understand the methodology, assumptions, and data used in your calculations.
Mandatory data
This year, the following information is required in order to enter a project into the 2026 RIAS Awards:
Gross internal conditioned floor area (m2)
% occupancy during 12-month period
Predicted energy use (kWh/m2/y)
Actual energy use (kWh/m2/y)
Is gas used on-site?
On-site renewable energy generation (kWh/y)
Potable water use (litres per person per day)
Design life (years)
-
If data is noted as required but is not applicable to your project, you can insert ‘0’ (zero) in the data field and provide an explanation in the relevant text box. For example, a bridge will not be able to provide some data due to its typology.
-
We ask that you try to complete as many questions as possible and as applicable to your project so that the jurors can understand the credentials of your scheme as much as possible.
If you are having trouble calculating the required data for your project, our team is here to help and provide guidance. Please reach out to us at awards@rias.org.uk to discuss this further.
If data is unavailable, please use of the text box in the final section of the form to explain why.
-
Yes.
All RIAS Award-winning projects will be considered for a RIBA National Award, and for the RIBA Stirling Prize following this.
In order to be eligible for this part of the RIBA Awards process, you must also provide the following:
Upfront carbon data.
Embodied carbon data.
Whole-life carbon data.
Resources
We understand that calculating, collating and providing this data can be daunting. If you would like to provide carbon data for your project, there are various tools available to calculate a building’s carbon footprint, including web-based platforms, plugins for commonly used software, and other open-source tools developed in-house by practices.
RIBA 2030 Climate Challenge Guidance
Structural Carbon Tool by IStructE
RIBA Awards Event | 12 November